Plot
Work started in the last quarter of 2012 on a beautiful plot looking out over Hotel Sen. The slope was less than ideal for building, and as the plot lies in a built-up area, its size left little room for handling materials. The view made it worthwhile.
Turnkey in 45 days
The build ran smoothly, kept to schedule and left the client satisfied. Within 45 days of unloading the lorry we had the house finished turnkey, with the kitchen, bathroom fittings and tiling all installed. It offers 59 m² of usable floor area plus a 62 m² terrace.
Here structural glulam showed its strengths: speed of construction and a clean finish.

Materials
- Throughout the interior, the floors are larch boards.
- The terrace is decked with profiled larch boards, with pine boarding on the underside.
- The bathroom and WC are lined with Siberian cedar, which releases a pleasant scent as the humidity rises.
All the timber came from Siberia, chosen for its particular properties.